Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D
Stainless Steel Thermos with Folded Handle 3D

Stainless Steel Thermos with Folded Handle

$29
Other Variants

Description

Stainless Steel Thermos with Folded Handle is a 3d model of an insulated beverage container, designed for durability and convenience in various environments. This model showcases a sleek, stainless steel construction with a practical folded handle for easy carrying and storage. The thermos features a screw-top lid and vacuum insulation to maintain the temperature of the contents. For product design visualization, kitchenware simulations, advertising materials, e-commerce platforms, educational tools, virtual reality (VR) environments, augmented reality (AR) applications, interior design projects, consumer goods marketing, and outdoor gear promotional or advertising projects. Stainless Steel Thermos with Folded Handle is a high quality, photo real 3d model that will enhance detail and realism to any of your rendering projects. The model has a fully textured, detailed design that allows for close-up renders, and was originally modeled in 3ds Max 2020 and rendered with V-Ray. Renders have no postprocessing! Hope you like it! ***** Features: - High quality polygonal model, has real dimensions. Easy to merge into your scene. - Units: cm - The model was created with the optimal number of polygons. (The Meshsmooth modifier is assigned to the original mesh. Easy to increase mesh resolution if necessary.) - All the objects come with complete UVs All textures and materials are included and mapped. (All colors can be easily modified.) - All objects are logically named and grouped for ease of objects selection and scene management. - No part-name confusion when importing several models into a scene. - No cleaning up necessary (Model does not include any backgrounds or scenes used in preview images.) - just drop model into your scene. - No special plugin needed to open scene. - PBR Materials ***** File Formats: - 3ds Max - Cinema 4D - Maya - Blender - OBJ, 3DS, FBX ***** Textures Formats: - 7 png (4096x4096) ***** 3d Molier International is a team of 3D artists with over a 15 years of experience. The company participated in various projects allowing us to learn our clients needs. Every model we build goes through thorough Quality assessment both visual and technical to make sure the assets look realistic and the models are of the best quality, which you can tell by looking at the renders - none of the has any postprocessing. We produce 3D models. This is our main activity. Our goal is to create a 3D copy of all objects on the world. Buy 3D models from professionals! Also check out our other models, just click on our user name to see complete gallery. (c) 3d_molier International - 2025

Categories

Tags

Formats
Native 3ds Max 2014 | V-Ray 3.6
3ds Max 2014 | Corona
3ds Max 2014 | Default Scanline
3ds Max 2014 | Mental Ray
Cinema 4D R17 | Default Scanline
Cinema 4D R17 | V-Ray for Cinema 4D 3.4
Maya 2016 | Maya Hardware
Maya 2016 | V-Ray 3.10
Maya 2016 | Redshift
3D Studio
Blender 2.8 | Eevee Renderer
FBX
OBJ
Modo 10.2
Specifications
Publish Date:July 30, 2024
Polygons:14348
Vertices:14489
Polygonal Quads/Tris Geometry:
Textures:
Materials:
UV Mapped:
Non-overlapping Unwrapped UVs:
Have questions? Contact us now.
Related Products
3D model Traveling Coffee Mug
Traveling Coffee Mug
3ds Max [+6]
$29
Thermos 2 3D model
Thermos 2
3ds Max [+6]
$19
3D model Coffee Thermos for Buffet
Coffee Thermos for Buffet
3ds Max [+13]
$39
JURO Stainless Steel Thermo Cup Black 3D
JURO Stainless Steel Thermo Cup Black
3ds Max [+13]
$24
Thermos 2 3D model
Thermos 2
3ds Max [+6]
$19
Termos Stanley Classic Bottle 3D model
Termos Stanley Classic Bottle
3ds Max [+13]
$29
3D Travel Mug Contigo Blue model
Travel Mug Contigo Blue
3ds Max [+13]
$29
Solo Plastic Clear Cup 3D
Solo Plastic Clear Cup
3ds Max [+5]
$19
JURO Stainless Steel Thermo Cup Black 3D
JURO Stainless Steel Thermo Cup Black
3ds Max [+13]
$24
3D Stainless Steel Knife Wooden Block Set model
Stainless Steel Knife Wooden Block Set
3ds Max [+7]
$49
3D model Traveling Coffee Mug
Traveling Coffee Mug
3ds Max [+6]
$29
3D Big Popcorn Bucket model
Big Popcorn Bucket
3ds Max [+7]
$39
Custom Production
We make fully-custom models, based on your specific requirements and within a fraction of a budget usually laid out for this type of work.
Modification Work
We can tweak any model you find in our library for the needs of your specific project.

East 54th Street, p.o. box 0832-0886 W.T.C., Mossfon Building,
2nd Floor, Panama, Republic of Panama

© 2026 3D Molier International