Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model
Rapid Racing Boat with Driver 3D model

Rapid Racing Boat with Driver

$179
Other Variants

Description

Rapid Racing Boat with Driver is a three-dimensional model of athletic male character (athlete type man) in the contemporary speedboat (speed boat, motor yacht or water motorsport vessel) that is a modern high-performance luxury water sport motor boat. Contemporary speedboats are cutting-edge vessels combining speed, luxury, and functionality. Powered by advanced motors, they are ideal for high-speed cruising, racing, or water sports. These boats feature sleek designs, high-end interiors, and top-tier navigation equipment, providing both thrill-seekers and luxury seekers with a premium on-water experience. For luxury racing motor boats, recreation boats engineering, racing marine vessels, modern luxury boats, ocean transportation, sea travel industry, recreation sea transports, luxury marine sport transport, modern marine technology, sport type sea transportation, water sport transport, ocean water sports, sea racing motor yachts, and sporting speedboats. Rapid Racing Boat with Driver is a high quality, photo real 3d model that will enhance detail and realism to any of your rendering projects. The model has a fully textured, detailed design that allows for close-up renders, and was originally modeled in 3ds Max 2020 and rendered with V-Ray. Renders have no postprocessing! Hope you like it! ***** Features: - High quality polygonal model, has real dimensions. Easy to merge into your scene. - Units: cm - The model was created with the optimal number of polygons. (The Meshsmooth modifier is assigned to the original mesh. Easy to increase mesh resolution if necessary.) - All the objects come with complete UVs All textures and materials are included and mapped. (All colors can be easily modified.) - All objects are logically named and grouped for ease of objects selection and scene management. - No part-name confusion when importing several models into a scene. - No cleaning up necessary (Model does not include any backgrounds or scenes used in preview images.) - just drop model into your scene. - No special plugin needed to open scene. - PBR Materials ***** File Formats: - 3ds Max - Cinema 4D - Maya - Blender - OBJ, 3DS, FBX ***** Textures Formats: - 31 png (4096x4096) ***** 3d Molier International is a team of 3D artists with over a 15 years of experience. The company participated in various projects allowing us to learn our clients needs. Every model we build goes through thorough Quality assessment both visual and technical to make sure the assets look realistic and the models are of the best quality, which you can tell by looking at the renders - none of the has any postprocessing. We produce 3D models. This is our main activity. Our goal is to create a 3D copy of all objects on the world. Buy 3D models from professionals! Also check out our other models, just click on our user name to see complete gallery. (c) 3d_molier International - 2025

Categories

Tags

Formats
Native 3ds Max 2014 | V-Ray 3.6
3ds Max 2014 | Corona
3ds Max 2014 | Default Scanline
3ds Max 2014 | Mental Ray
Cinema 4D R17 | Default Scanline
Cinema 4D R17 | V-Ray for Cinema 4D 3.4
Maya 2016 | Maya Hardware
Maya 2016 | V-Ray 3.10
Maya 2016 | Redshift
3D Studio
Blender 2.8 | Eevee Renderer
FBX
OBJ
Modo 10.2
Specifications
Publish Date:September 16, 2024
Polygons:112776
Vertices:126631
Polygonal Quads/Tris Geometry:
Textures:
Materials:
UV Mapped:
Non-overlapping Unwrapped UVs:
Have questions? Contact us now.
Related Products
3D Motor Yacht
Motor Yacht
3ds Max [+6]
$79
3D Motor Yacht 2 model
Motor Yacht 2
3ds Max [+6]
$79
Eclipse Super Yacht 3D model
Eclipse Super Yacht
3ds Max [+13]
$129
Offshore Sailing Yacht 2 3D model
Offshore Sailing Yacht 2
3ds Max [+6]
$99
Contender 39 FA Sport Fishing Boat 3D model
Contender 39 FA Sport Fishing Boat
3ds Max [+13]
$89
3D Motor Yacht
Motor Yacht
3ds Max [+6]
$79
Small Sailing Yacht 3D model
Small Sailing Yacht
3ds Max [+6]
$79
3D Sailing Yacht model
Sailing Yacht
3ds Max [+6]
$79
3D Motor Yacht 2 model
Motor Yacht 2
3ds Max [+6]
$79
3D Yacht with Sails Down
Yacht with Sails Down
3ds Max [+12]
$79
3D Sailing Yacht model
Sailing Yacht
3ds Max [+12]
$79
Large Solar Powered Boat 3D model
Large Solar Powered Boat
3ds Max [+13]
$99
Custom Production
We make fully-custom models, based on your specific requirements and within a fraction of a budget usually laid out for this type of work.
Modification Work
We can tweak any model you find in our library for the needs of your specific project.

East 54th Street, p.o. box 0832-0886 W.T.C., Mossfon Building,
2nd Floor, Panama, Republic of Panama

© 2026 3D Molier International