New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D
New Holland TK4 Crawler Cabin Dirty Rigged 3D

New Holland TK4 Crawler Cabin Dirty Rigged

$99
Other Variants

Description

New Holland TK4 Crawler Cabin Dirty Rigged is a three-dimensional model of a modern farming caterpillar vehicle used in agribusiness industry for all-terrain pulling works. Specialized industrial all-terrain farming machinery used for agriculture industry works, which is farm tracked tractor (farm caterpillar transport, farm tracked machine or farm crawler vehicle), which designed to climb the hills and mountains of fruit gardens, vineyards, nut orchards or fruit groves. For tractor vehicles, farm agricultural works, rural harvest machinery, farm engineering, tracked tractors, modern agribusiness, modern farm machinery, agribusiness equipment, farming harvest machinery, farming tracked transport, agricultural machinery, industrial harvesting machines, tractor vehicles, farm equipment or agriculture industry promotional projects. New Holland TK4 Crawler Cabin Dirty Rigged is a high quality, photo real 3d model that will enhance detail and realism to any of your rendering projects. The model has a fully textured, detailed design that allows for close-up renders, and was originally modeled in 3ds Max 2020 and rendered with V-Ray. Renders have no postprocessing! New Holland TK4 Crawler Cabin Dirty Rigged is fully rigged and is ready to be animated. You can easily position it the way you need or animate it the way your project requires using helpers in 3D Studio Max. See the turntable to get an idea of how rigging works. Hope you like it! ***** Features: - High quality polygonal model, has real dimensions. Easy to merge into your scene. - Units: cm - The model was created with the optimal number of polygons. (The Meshsmooth modifier is assigned to the original mesh. Easy to increase mesh resolution if necessary.) - All the objects come with complete UVs All textures and materials are included and mapped. (All colors can be easily modified.) - All objects are logically named and grouped for ease of objects selection and scene management. - No part-name confusion when importing several models into a scene. - No cleaning up necessary (Model does not include any backgrounds or scenes used in preview images.) - just drop model into your scene. - No special plugin needed to open scene. - PBR Materials ***** File Formats: - 3ds Max ***** Textures Formats: - 13 png (4096x4096) ***** 3d Molier International is a team of 3D artists with over a 15 years of experience. The company participated in various projects allowing us to learn our clients needs. Every model we build goes through thorough Quality assessment both visual and technical to make sure the assets look realistic and the models are of the best quality, which you can tell by looking at the renders - none of the has any postprocessing. We produce 3D models. This is our main activity. Our goal is to create a 3D copy of all objects on the world. Buy 3D models from professionals! Also check out our other models, just click on our user name to see complete gallery. (c) 3d_molier International - 2025

Categories

Tags

Formats
Native 3ds Max 2014 | V-Ray 3.6
3ds Max 2014 | Corona
3ds Max 2014 | Default Scanline
3ds Max 2014 | Mental Ray
Specifications
Publish Date:January 24, 2022
Polygons:244676
Vertices:250717
Polygonal Quads/Tris Geometry:
Textures:
Materials:
UV Mapped:
Non-overlapping Unwrapped UVs:
Have questions? Contact us now.
Related Products
BRAUD 9090X Grape Harvester 3D
BRAUD 9090X Grape Harvester
3ds Max [+13]
$99
3D Discbine 210 Side Pull Disc Mower Conditioners
Discbine 210 Side Pull Disc Mower Conditioners
3ds Max [+13]
$49
3D New Holland TK4 Crawler Cabin New model
New Holland TK4 Crawler Cabin New
3ds Max [+13]
$79
3D model New Holland Roll Belt 460
New Holland Roll Belt 460
3ds Max [+13]
$69
3D model New Holland 750BFI Rotary Corn Head Harvesting Unit New
New Holland 750BFI Rotary Corn Head Harvesting Unit New
3ds Max [+13]
$49
Tractor Generic with New Holland Roll Belt 3D
Tractor Generic with New Holland Roll Belt
3ds Max [+13]
$149
Tractor Generic Detailed Interior Clean 3D model
Tractor Generic Detailed Interior Clean
3ds Max [+7]
$139
3D model Farm Sprayer Generic
Farm Sprayer Generic
3ds Max [+7]
$129
Agrifac Condor 5 Crop Sprayer 3D model
Agrifac Condor 5 Crop Sprayer
3ds Max [+13]
$139
Tractor with Dump Trailer New 3D model
Tractor with Dump Trailer New
3ds Max [+7]
$159
Old Vintage Tractor Generic 3D
Old Vintage Tractor Generic
3ds Max [+13]
$99
Tractor Massey Ferguson 385 3D
Tractor Massey Ferguson 385
3ds Max [+5]
$99
Custom Production
We make fully-custom models, based on your specific requirements and within a fraction of a budget usually laid out for this type of work.
Modification Work
We can tweak any model you find in our library for the needs of your specific project.

East 54th Street, p.o. box 0832-0886 W.T.C., Mossfon Building,
2nd Floor, Panama, Republic of Panama

© 2026 3D Molier International