3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model
3D Katy Perry Gold Brown Sissy Pumps model

Katy Perry Gold Brown Sissy Pumps

$39
Other Variants

Description

Katy Perry Gold Brown Sissy Pumps is a three-dimensional model of a modern women fashion footwear which are types of high heels, female shoes. Modern stylish women footwear with very high heels, without buckles or straps. Fashionable high heel (spike heel or stiletto) shoes which can easily be taken off. For women footwear fashion, women fashion accessories, modern clothes design, personal items, stylish women's accessories, ballroom dresses, women clothing, female footwear accessories, shopping, female shoes fashion, shoe fashion, shoe design, women holiday accessories, or modern leather footwear promotional projects. Katy Perry Gold Brown Sissy Pumps is a high quality, photo real 3d model that will enhance detail and realism to any of your rendering projects. The model has a fully textured, detailed design that allows for close-up renders, and was originally modeled in 3ds Max 2020 and rendered with V-Ray. Renders have no postprocessing! Hope you like it! ***** Features: - High quality polygonal model, has real dimensions. Easy to merge into your scene. - Units: cm - The model was created with the optimal number of polygons. (The Meshsmooth modifier is assigned to the original mesh. Easy to increase mesh resolution if necessary.) - All the objects come with complete UVs All textures and materials are included and mapped. (All colors can be easily modified.) - All objects are logically named and grouped for ease of objects selection and scene management. - No part-name confusion when importing several models into a scene. - No cleaning up necessary (Model does not include any backgrounds or scenes used in preview images.) - just drop model into your scene. - No special plugin needed to open scene. - PBR Materials ***** File Formats: - 3ds Max - Cinema 4D - Maya - Blender - OBJ, 3DS, FBX ***** Textures Formats: - 5 png (4096x4096) ***** 3d Molier International is a team of 3D artists with over a 15 years of experience. The company participated in various projects allowing us to learn our clients needs. Every model we build goes through thorough Quality assessment both visual and technical to make sure the assets look realistic and the models are of the best quality, which you can tell by looking at the renders - none of the has any postprocessing. We produce 3D models. This is our main activity. Our goal is to create a 3D copy of all objects on the world. Buy 3D models from professionals! Also check out our other models, just click on our user name to see complete gallery. (c) 3d_molier International - 2025

Categories

Tags

Formats
Native 3ds Max 2014 | V-Ray 3.6
3ds Max 2014 | Corona
3ds Max 2014 | Default Scanline
3ds Max 2014 | Mental Ray
Cinema 4D R17 | Default Scanline
Cinema 4D R17 | V-Ray for Cinema 4D 3.4
Maya 2016 | Maya Hardware
Maya 2016 | V-Ray 3.10
Maya 2016 | Redshift
3D Studio
Blender 2.8 | Eevee Renderer
FBX
OBJ
Modo 10.2
Specifications
Publish Date:December 21, 2021
Polygons:4536
Vertices:4522
Polygonal Quads/Tris Geometry:
Textures:
Materials:
UV Mapped:
Non-overlapping Unwrapped UVs:
Have questions? Contact us now.
Related Products
High Heels Women Shoes 3D
High Heels Women Shoes
3ds Max [+7]
$39
Silver Shoes 3D
Silver Shoes
3ds Max [+13]
$39
Green Padded Mule Bottega Veneta 3D
Green Padded Mule Bottega Veneta
3ds Max [+13]
$34
Stretch Wedge Sandals Black Bottega Veneta 3D
Stretch Wedge Sandals Black Bottega Veneta
3ds Max [+13]
$39
High Heels Women Shoes 3D
High Heels Women Shoes
3ds Max [+7]
$39
Silver Shoes 3D
Silver Shoes
3ds Max [+13]
$39
Green Padded Mule Bottega Veneta 3D
Green Padded Mule Bottega Veneta
3ds Max [+13]
$34
Stretch Wedge Sandals Black Bottega Veneta 3D
Stretch Wedge Sandals Black Bottega Veneta
3ds Max [+13]
$39
Waterskis 3D model
Waterskis
3ds Max [+5]
$39
Leonardo da Vinci Glider 3D model
Leonardo da Vinci Glider
3ds Max [+7]
$59
3D model Leonardo da Vinci Aerial Screw
Leonardo da Vinci Aerial Screw
3ds Max [+6]
$49
3D model Martin Luther King Jr Memorial
Martin Luther King Jr Memorial
3ds Max [+13]
$99
Custom Production
We make fully-custom models, based on your specific requirements and within a fraction of a budget usually laid out for this type of work.
Modification Work
We can tweak any model you find in our library for the needs of your specific project.

East 54th Street, p.o. box 0832-0886 W.T.C., Mossfon Building,
2nd Floor, Panama, Republic of Panama

© 2026 3D Molier International